With all the projects going on this Summer and the multiplication of engine rebuilds happening and loss of storage space -- it's time to expand and make some real room to get work done!
Along comes a dumpster and of course you have to fill it. So went in the initial bits of the garage wing in preparation of the new garage bay and shop area in back.
This is the shot with the old wing left over before demo. I've been cutting the lean-too's rafters from the attic this week to pull it off the original garage.
Yuck. the cracked slab of the sunroom area with a totally failed slab letting in tree roots and all sorts of moisture. Not this time around!
Rachel scores a $40.00 concrete mixer that works great! Will use it to mix up concrete for the piers and other items in preparation of the main shop/garage project! Too small to do a slab unless you do it in October...